6commissioning, 2 preparing for operation – Pilz PNOZ mm0.2p User Manual

Page 30

background image

6.2

Preparing for operation

6

Commissioning

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

6-6

*Two loads may be connected to each safety output with advanced fault
detection, even on applications in accordance with EN IEC 62061, SIL
CL 3. Prerequisite: Feedback loop is connected, shorts across contacts
and external power sources are excluded (e.g. through separate multi-
core cables). Please note that, in the event of an error in the feedback
loop, the safety system switches to a safe condition and shuts down

all

the outputs.

Connection examples for feedback loop

Feedback loop

Redundant output

Contacts from external contactors

K1

L+

L-

K2

O0 (O2, O4)

O1 (O3, O5)

IM0

L-