2 load project via usb port, 4 connection, 6commissioning – Pilz PNOZ mm0.2p User Manual

Page 28: 2 preparing for operation

background image

6.2

Preparing for operation

6

Commissioning

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

6-4

6.2.3.2

Load project via USB port

Load project via USB port

6-

Verdrahtung_mini_multi_Basis_Betr_erstes_Mal_USB_BA

Procedure:

Insert a chip card into the card slot on the base unit.

Connect the computer containing the PNOZmulti Configurator to the

base unit via the USB port.

Switch on the supply voltage.

Download the project (see PNOZmulti Configurator's online help).

Once the project has been successfully downloaded, the status of the

inputs and outputs and the supply voltage will be shown on the dis-

play. The "RUN" LED will be lit.

6.2.4

Connection

Connection

6-

Betriebsbereitschaft_herstellen_multi-mini Basisgerät

Supply voltage

Supply voltage

AC

DC

For the safety system

For the semiconductor outputs
Must always be present, even if the
semiconductor outputs are not used

A1

+ 24 V DC

A2

0 V

24 V

+ 24 V DC

0 V

0 V