3 getting started, Toolbox installation, Inserting and removing test modules – EXFO FTB-8500 Series for FTB-500 User Manual
Page 23: Turning the unit on, 3getting started, Aution, Arning
Ethernet and Fibre Channel Application
9
3
Getting Started
If the Ethernet and Fibre Channel Application has been purchased at the
same time as the FTB-500, the Ethernet and Fibre Channel Application
module is pre-installed with the appropriate /ToolBox software version.
ToolBox Installation
ToolBox is the baseline software and thus needs to be installed on the
FTB-500 before using the Ethernet and Fibre Channel Application module.
Note: Refer to the FTB-500 platform user guide for more information on ToolBox
installation procedure.
Inserting and Removing Test Modules
Note: Refer to the FTB-500 platform user guide for more information on how to
insert a module into the FTB-500 or to remove a module from the FTB-500.
Turning the Unit On
Turn on the FTB-500. Refer to the FTB-500 platform user guide for more
information.
C
AUTION
Never insert or remove a module while the FTB-500 is turned on.
This will result in immediate and irreparable damage to both the
module and unit.
W
ARNING
When the laser safety LED (
) is flashing on the FTB-500, at least
one of your modules is emitting an optical signal. Please check all
modules, as it might not be the one you are currently using.