Unload, Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 83
Transport - 82
JT25 Operator’s Manual
Tow
CMW
Unload
1.
Lower ramps.
2.
Remove tiedowns.
3.
Start drilling unit engine.
4.
Using tethered ground drive controller, pull power mode switch into low position. See page 25.
5.
Raise stabilizers.
6.
Raise drill frame.
7.
Slowly back unit down trailer or ramps.
Tow
Under normal conditions, drilling unit should not be towed. If towing is necessary:
•
tow for short distances at less than 1 mph (1.6 km/h),
•
attach chains to indicated tow points facing towing vehicle (shown),
•
use maximum towing force of 1.5 times unit weight,
•
disengage track planetaries.
If front tow points are facing towing vehicle, loop chain (1) through tow point and pull straight forward. If
back tow points are facing towing vehicle, loop chain (2) through each tow point and bring them together to
a central pull point.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
To help avoid injury:
•
Attach trailer to vehicle before loading or unloading.
•
Load and unload trailer on level ground.
•
Ensure trailer wheels are blocked.