Ditch Witch JT60AT User Manual
Jt60/jt60 all terrain, Operator’s manual
This manual is related to the following products:
Table of contents
Document Outline
- Overview
- Foreword
- Safety
- Controls
- Operation Overview
- Prepare
- Drive
- Transport
- Conduct a Bore
- Position Equipment
- Connect Fluid System
- Start System
- Prime Drilling Fluid Pump
- Operate Carriage Control
- Clamp Pipe
- Assemble Drill String
- Drill First Pipe
- Swab the Hole
- Enable Automated Pipeloader System
- Add Pipe
- Correct Direction
- Use AutoCarve
- Record Bore Path
- Surface Drill Head
- Backream
- Remove Pipe
- Remove Pullback Device
- Systems and Equipment
- Complete the Job
- Service
- Specifications
- Service Record
- Support
- Warranty