Drilling, Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 58
JT25 Operator’s Manual
Operation Overview - 57
Drilling
CMW
Drilling
1.
2.
Engage tracker control if desired. See page 121.
3.
Drill first pipe. See page 93.
4.
Record bore path. See page 100.
5.
Enable automated pipeloader system. See page 93.
6.
7.
Drill remaining pipes in pipe box.
•
Correct direction. See page 96.
•
Engage cruise control. See page 140.
8.
Add additional drill pipe to empty box (see page 136) to complete bore.
9.
Surface drill head. See page 100.
•
Remove drill head.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)