Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 139
Systems and Equipment - 138
JT25 Operator’s Manual
Pipe Boxes
CMW
5.
Load a pipe in auxiliary pipe loaders and rest it against pipe stop.
6.
Move auxiliary pipe loaders under row 5.
7.
Raise pipe into row 5.
8.
Move shuttles all the way out.
9.
Repeat steps 9-12 to load more pieces of pipe into row 5.
10. Move pipe to pipeloader grippers.
•
Raise last pipe into row 5.
•
Move shuttles out.
•
Lower pipe into front grippers.
11. Before operating pipeloader:
•
Close both auxiliary pipe loaders.
•
Remove pipe stop and store it on shuttle guard.
•
Step away from drilling unit.
Remove Single Pipe
Unload all drill pipe loaded with auxiliary pipe
loaders. Pipe in fifth row of pipe box can be
unloaded only when all other rows are empty.
1.
Ensure fifth row is selected.
2.
Move shuttles out fully.
3.
Pull and hold pins (1) on each shuttle and
slide out auxiliary pipe loaders (2).
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE: Drill pipe is heavy. Have enough people on hand to manually add or remove single pipe to
pipe box.