Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 117
Systems and Equipment - 116
JT25 Operator’s Manual
Electric Strike System
CMW
Voltage Test
1.
Place voltage limiter on something insulated from ground and drilling unit (such as dry board or tire),
but near frame of drilling unit.
2.
Clip one lead to frame.
3.
Clip other lead to one voltage limiter mount.
4.
Move simulator switch to "voltage" and press test button.
5.
Watch screen and lights above display on strike system.
•
All lights should turn on.
•
Alarm and strobe should turn on.
•
Voltage "V" should show 90-110%.
It is normal for simulator voltage levels to drift below strike level. When this happens, light in triangle should
go off and alarm and strobe should stop working. If the level drifts above strike level again, light, alarm, and
strobe should be turned on again.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)