Pipe boxes, Remove/install pipe box, Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 135
Systems and Equipment - 134
JT25 Operator’s Manual
Pipe Boxes
CMW
Pipe Boxes
Remove/Install Pipe Box
Position Lift Pin Block
The pipe box has 7 lift pin block holes.
•
Use center hole to keep pipe box level for transporting pipe boxes and loading onto level drill frame.
•
Use side holes to angle box for loading onto angled drill frame.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE:
•
Lift only one box of pipe at a time.
•
Use crane capable of supporting the equipment's size and weight. See page 193 or measure and
weigh equipment before lifting.
Electric shock. Contacting electric lines will cause death or serious injury.
Know location of lines and stay away.
NOTICE:
•
Do not attempt to load and unload pipe while drilling or backreaming. Unprotected worker can be
injured by electric strike.
•
On electrical jobsite, load and unload pipe only if grid mats are properly set up and connected to
drilling unit and loader is wearing electrically insulating boots and gloves.