Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 25
Controls - 24
JT25 Operator’s Manual
Set-Up Console
6.
Left track switch
To move forward, press top.
To move backward, press
bottom.
IMPORTANT: Use track switches only
if tethered control is inoperable.
7.
Right stabilizer control
To raise, pull up.
To lower, push down.
IMPORTANT: Lower left and right
stabilizers to the ground together,
then adjust individually.
WARNING: Crushing weight could
cause death or serious injury. Use
proper procedures and equipment or
stay away.
8.
Left stabilizer control
To raise, pull up.
To lower, push down.
IMPORTANT: Lower left and right
stabilizers to the ground to stabilize
unit and then adjust for side-to-side
stability.
WARNING: Crushing weight could
cause death or serious injury. Use
proper procedures and equipment or
stay away.
9.
Back frame tilt control
To raise, pull up.
To lower, push down.
IMPORTANT: To ensure a stable
platform for drilling, use front and
back tilt controls together to set frame
at desired pitch without raising tracks
off the ground.
10. Front frame tilt control
To raise, pull up.
To lower, push down.
IMPORTANT: To ensure a stable
platform for drilling, use front and
back tilt controls together to set frame
at desired pitch without raising tracks
off the ground.
Item
Description
Notes
c00ic147h.eps
c00ic606h.eps
c00ic607h.eps