Prepare Jobsite

CMW

Prepare Jobsite

Mark Bore Path

Mark your planned bore path and all located utility lines with flags or paint.

Prepare Entry Point

For bore to be successful, first pipe must be straight as
it enters the ground. “Align the Joints” on page 132.

To help ensure that the first pipe does not bend, dig a
small starting hole so that the first pipe is drilled into a
vertical surface. Steer down as required at start. Drill
head will tend to move in easiest direction (toward
surface) when rotated near the surface.

To prevent bending or straining pipe, position drilling
unit for straight entry.

Jobsite hazards could cause death or serious injury. Use

correct equipment and work methods. Use and maintain proper safety
equipment.

To help avoid injury:

Classify jobsite as electric if jobsite classification is in question or if the possibility of unmarked
electric utilities exists.

Expose lines by hand before digging. Cutting high voltage cable can cause electrocution.

Remove all vegetation near operator’s station. Contact with trees, shrubs, or weeds during electrical
strike could result in electrocution.