Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 140
JT25 Operator’s Manual
Systems and Equipment - 139
Pipe Boxes
CMW
4.
Remove pipe stop (stored on outside of
drill frame) and attach to front of pipe box.
5.
Raise pipe in row 5.
6.
Move pipe to auxiliary pipe loaders.
•
Move shuttles in.
•
Lower pipe into auxiliary pipe loaders.
7.
Move shuttles out.
8.
Remove pipe from auxiliary pipe loaders and store properly.
9.
Repeat steps 5-8 to unload remaining added drill pipe.
10. After all added drill pipe is unloaded with auxiliary pipe loaders:
•
Close both auxiliary pipe loaders.
•
Remove pipe stop and store it on shuttle guard.
•
Step away from pipeloader.
11. Finish loading remaining drill pipe into row 5 using standard procedure. See “Remove Pipe” on
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE: Drill pipe is heavy. Have enough people on hand to manually add or remove single pipe to
pipe box.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)