JT25 Operator’s Manual

Systems and Equipment - 139

Pipe Boxes

CMW

4.

Remove pipe stop (stored on outside of
drill frame) and attach to front of pipe box.

5.

Raise pipe in row 5.

6.

Move pipe to auxiliary pipe loaders.

Move shuttles in.

Lower pipe into auxiliary pipe loaders.

7.

Move shuttles out.

8.

Remove pipe from auxiliary pipe loaders and store properly.

9.

Repeat steps 5-8 to unload remaining added drill pipe.

10. After all added drill pipe is unloaded with auxiliary pipe loaders:

Close both auxiliary pipe loaders.

Remove pipe stop and store it on shuttle guard.

Step away from pipeloader.

11. Finish loading remaining drill pipe into row 5 using standard procedure. See “Remove Pipe” on

page 103.

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

NOTICE: Drill pipe is heavy. Have enough people on hand to manually add or remove single pipe to
pipe box.