beautypg.com

Tie down, Jt25 operator’s manual – Ditch Witch JT25 User Manual

Page 82

background image

JT25 Operator’s Manual

Transport - 81

Load

CMW

Tie Down

Points

Tiedown points are identified by tiedown decals. Securing to trailer at other
points can damage machinery.

Procedure

Loop a transport chain around each tie down point. See chart below for correct distances between tiedown
ends. Make sure tiedowns are tight before transporting.

NOTICE:

Wrenches can open after engine shutdown. Ensure that any downhole tool or pipe in wrenches is
attached to spindle or removed before transport.

Use Grade 7-3/8” (18.7 cm) transport chain to secure drilling unit.

Distance

U.S.

Metric

A

12-45” 31-114

cm

B

12-45” 31-114

cm

C

less than 55”

less than 140 cm