Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 40
JT25 Operator’s Manual
Controls - 39
Right Control Console
6.
Operator’s station pivot
control switch
To pivot into drilling position,
press top.
To pivot into transport
position, press bottom.
NOTICE: Move carriage only when
operator’s station is in drilling position.
7.
Add pipe/manual/
remove pipe switch
To select “add pipe”
automated pipeloader
function, press top.
To use manual pipeloader
controls, move to center.
To select “remove pipe”
automated pipeloader
function, press bottom.
See “Remove Pipe” on page 103.
8.
Drilling fluid pump
switch
To turn on, press once.
To turn off, press once.
9.
Drilling fluid quick fill
switch
For full pump flow to fill pipe
with fluid, press and hold.
To return fluid flow to flow
control setting, release.
Item
Description
Notes
c00ic624h.eps
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)