Planning, Setting up at jobsite, Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 57
Operation Overview - 56
JT25 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 61.
2.
3.
Classify jobsite. See page 64.
4.
5.
Check supplies and prepare equipment. See page 72.
6.
Setting Up at Jobsite
1.
2.
Mix drilling fluid. See page 117.
3.
Unload drilling unit from trailer. See page 82.
4.
Assemble drill string. See page 73.
5.
Position drilling unit and drill frame. See page 87.
6.
Assemble strike system. See page 111.
7.
Anchor drilling unit. See page 109.
8.
Connect fluid system. See page 87.
9.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)