Index – Reznor SC Duct Furnace Unit Installation Manual User Manual
Page 39

Form I-SC, P/N 207696 R11, Page 39
INDEX
B
Brackets for Attaching the
Concentric Adapter Box
Burner Air Shutters 32
Burner Carryover Systems
C
Check Installation and
Check Valve Outlet
Cleaning the Heat Exchanger
Clearances to a Horizontal
Vent Terminal 14
Combustion Air 9
Combustion Air Inlet 17
Combustion Air Inlet
Combustion Air Pipe 10
Concentric Adapter Box 12
Concentric Adapter Box
D
Discharge Air Sensor 23
Optional Condensation Drain
Duct Connection Dimensions
Ductstat with Electronic
Remote Setpoint Module
(Option AG15) 28
E
Optional Electronic
Exhaust (Vent) Terminal 17
F
G
Gas Valve 35
H
Horizontal Vent Kit 14
I
Installation Instructions for
Horizontal Vent Kit 14
Installation Instructions for
Vertical Vent Kit 17
Installation of Separated-
Combustion Unit with
Vertical Vent Terminal 20
INSTALLATION RECORD
J
L
M
Makeup Air Application 28
Manifold or Orifice (Valve
P
Pilot and Ignition Systems
Preparing the Furnace for
R
Reversing Air Flow 5
S
Screened Exhaust Assembly
Shipped-Separate
Combustion Air Proving
T
Optional Two-Stage
Optional Two-Stage
Operation - Makeup Air 28
Typical Separated-
Combustion Unit with
U
V
Vent/Combustion Air System
Vertical Vent Kit 17
Supply Voltage 24
W