RTU Open

5

To install the RTU Open:

1

Mount the controller (page 6).

2

Wire the controller for power (page 7).

Using the rooftop equipment control power transformer (page 8).

Using an auxiliary control power transformer (page 8).

3

Set the controller's address (page 9).

4

Wire inputs and outputs (page 12).

5

Wire sensors to the controller (page 18).


Field-supplied hardware

An RTU Open retrofit installation may require the following field-supplied components:

wiring harness: Part #OPN-RTUHRN

transformer – 24 Vac, 20 VA minimum

wiring

Application-dependent components:

carbon dioxide sensors

damper/damper actuator

differential pressure switch

enthalpy switch

fan status switch

door switch

fan section door switch

relative humidity sensor

remote occupancy contact

smoke detector

temperature sensors


Installation