Installation, Field-supplied hardware – Carrier RTU OPEN 11-808-427-01 User Manual
Page 11
![background image](/manuals/69183/11/background.png)
RTU Open
5
To install the RTU Open:
1
Mount the controller (page 6).
2
Wire the controller for power (page 7).
○
Using the rooftop equipment control power transformer (page 8).
○
Using an auxiliary control power transformer (page 8).
3
Set the controller's address (page 9).
4
Wire inputs and outputs (page 12).
5
Wire sensors to the controller (page 18).
Field-supplied hardware
An RTU Open retrofit installation may require the following field-supplied components:
•
wiring harness: Part #OPN-RTUHRN
•
transformer – 24 Vac, 20 VA minimum
•
wiring
Application-dependent components:
•
carbon dioxide sensors
•
damper/damper actuator
•
differential pressure switch
•
enthalpy switch
•
fan status switch
•
door switch
•
fan section door switch
•
relative humidity sensor
•
remote occupancy contact
•
smoke detector
•
temperature sensors
Installation
- 42S (72 pages)
- 30GT (4 pages)
- 48SS060 (8 pages)
- 50ME (54 pages)
- 38AH024-034 (26 pages)
- ZC (28 pages)
- 30GA (12 pages)
- COMFORTLINK 48A2 (8 pages)
- 48HE003---006 (64 pages)
- 33ZCSECTRM (52 pages)
- 19XRV (40 pages)
- MODU-PAC 50DF (37 pages)
- 17DA (8 pages)
- SINGLE PACKAGED ELECTRIC COOLING UNITS 50GS (28 pages)
- 48JZ (N) 024-060 (30 pages)
- 30GX080-176 (8 pages)
- 50DL (24 pages)
- 50GL-A (4 pages)
- NP034-074 (72 pages)
- 40GXQ (12 pages)
- 30XA080-500 (8 pages)
- 39E (12 pages)
- 40KMQ------301 (10 pages)
- 38AE (12 pages)
- 48AW (118 pages)
- 38GXQ (28 pages)
- 48ES---A (38 pages)
- 48GL (22 pages)
- 48GH (22 pages)
- 40QA024-060 (24 pages)
- TJF004 (52 pages)
- 39LD (40 pages)
- 48DL (4 pages)
- 48/50TC04---28 (44 pages)
- 50EJ (56 pages)
- 17EX (120 pages)
- 50BB (8 pages)
- 50BA (24 pages)
- 50BB (16 pages)
- 50BJ (20 pages)
- 30H (16 pages)
- 48HJD005-007 (48 pages)
- 50ZP (6 pages)
- 50DP016 (16 pages)
- 50LJ008-014 (19 pages)