beautypg.com

Configuration parameters, List of parameters – EVCO CT1SA0040101 User Manual

Page 29

background image


Stop leavening specifications
CT1SA0040101
Vers. 1.11

29/36

26. CONFIGURATION PARAMETERS

26.1. List of Parameters

NAME DESCRIPTION MIN

MAX

DEF

UNIT

General Configurations

P1

Display selection if power on
0 = none
1= EVCO s.r.l.

0 1 1

---

P2

0 = Celsius 1 = Fahrenheit

0

1

0

---

P3

Cell probe offset

-15

15

0

°C

P4

Evaporator probe offset

-15

15

0

°C

P5

Humidity probe lower threshold

0

P6

0

%

P6

Humidity probe upper threshold

P5

200

100

%

P7

Input polarity for door contact
0 = NC
1 = NO

0 1 0

---

P8

LV input polarity for thermostat
0 = NC
1 = NO

0 1 1

---

P9

Power down duration for automatic program reset

1

60

15

minutes

P10

Selection after power down for automatic program
0 = an automatic cycle starts again only if power down is less than P9 minutes
1 = an automatic cycle always starts again

0 1 1

---

P11

Power down duration for manual program reset

1

60

15

minutes

P12

Status selection after power down for the manual program
0 = a manual cycle starts again only if power down is less than P11 minutes
1 = a manual cycle always starts again

0 1 1

---

Setpoint

P13

Cold Min setpoint

-30

P14

-3

°C

P14

Cold Max setpoint

P13

90

15

°C

P15

Cold hysteresis

2

10

3

°C

P16

Cold dead zone for refrigeration, stop and preservation

0

10

1

°C

P17

Cold dead zone for heating, awakening and rising

0

10

3

°C

P18

Cold dead zone for climatization and slowing down

0

10

1

°C

P19

Hot Min setpoint

0

P20

0

°C

P20

Hot Max setpoint

P19

90

35

°C

P21 Hot

hysteresis

2

10

3

°C

P22

Hot dead zone for heating, awakening and rising

0

10

1

°C

P23

Hot dead zone for climatization and slowing down

0

10

3

°C

P24

Number of steps for resistance adjustment in the awakening phase

1

10

3

---

P25

Number of steps for resistance adjustment in the rising phase

1

10

3

---

Compressor Timing

P26

Delay between two successive compressor activations

0

60

2

minutes

P27

Delay between compressor activation and switch-off

0

60

2

minutes

P28

Compressor switch-on delay from power on

0

255

2

minutes

P29

Compressor enforced switching on duration at the awakening, rising and slowing
down phase start

0 60 0

minutes

Resistance Timing

P30

Resistance activation minimum time

0

255

0

seconds

Humidification and dehumidification

P31

Cell temperature lower limit for humidification/dehumidification

0

90

10

°C

P32

Humidity control mode
0 = with humidity probe
1 = time cycles based on the setup percentage
2 = one-minute steps

0 2 0

__

P33

Pause time if P32 = 2

0

60

10

minuts

P34

Humidification cycle duration if P32 = 1

30

600

60

seconds

P35

Max. humidification time if P32 = 1

0

P34

30

seconds