Kontron CG1200 Carrier Grade Server User Manual
Page 72
66
Kontron CG1200 Carrier Grade Server Installation and Maintenance Guide 66
Figure 53: Removing the Front Panel Board from the Chassis
5.3.2 Installing the New Front Panel Board
1. Tilt the new FP board and slide it toward the front of the chassis so the USB connectors fit through
the slot on the front panel of the chassis and the two keyhole slots fit over the standoffs on the
chassis floor. For assistance, see Figure 53 “A” and “B”.
2. Replace and tighten the screws and eUSB standoff on the board to secure the board to the chassis
floor.
3. Reconnect all of the cables on the FP board. For locations of each header on the board, see Figure
52.
3.1. Re connect the SSI front panel board power cable that comes from the power distribution board.
3.2. Reconnect the FP signal cable that comes from the baseboard.
3.3. Reconnect the LED/switch board ribbon cable.