3 - 4wd dyno installation, 34wd d, Nstallation – Dynojet 424xLC2: Installation Guide User Manual
Page 43

3-1
Above Ground Model 424x/424xLC
2
Automotive Dynamometer Installation Guide
C
H A P T E R
3
4WD D
YNO
I
NSTALLATION
This chapter will walk you through unpacking and installing the 4WD dyno. To ensure
safety and accuracy in the procedures, perform the procedures as they are described.
This chapter is divided into the following categories:
• Unpacking and Inspecting the Dyno, page 3-2
• Dyno Installation, page 3-9
• Eddy Current Brake Installation, page 3-12
• Cable Routing, page 3-13
• Hydraulic Movement Installation, page 3-23
• Air Can Sleeve, page 3-32
• 4WD Movement Test, page 3-33
• Bridge Installation—Stationary Dyno, page 3-34
• Bridge Installation—4WD Dyno, page 3-40
• Deck Installation, page 3-45
• Logo Panel Installation, page 3-51
This manual is related to the following products: