Dynojet 424xLC2: Installation Guide User Manual
Page 188

I N D E X
Above Ground Model 424x/424xLC
2
Automotive Dynamometer Installation Guide
Index-ii
D
deck
center panel 3-49
inner brace 3-47
installing 3-45
mounting bracket 3-46
outer brace 3-47
outside panels 3-48
tube 3-50
deck relocation C-2
dimensions
dyno, 4WD 1-6
dyno, bridge and deck 1-7
dyno, stationary 1-5
disclaimers v
document part number 1-1
drill and drill bit 1-8
drum 1-4
drum brake air hose 3-14, 3-15, 3-17, 3-21
drum guards
installing, 4WD 3-41
installing, stationary 3-35
dyno cylinder mount 3-23, 3-24
dyno electronics 1-13
dyno movement pendant cable 3-14
routing 3-15, 3-17, 3-21
dyno requirements 1-4
see also requirements
dynoware RT
module connections 1-14
network connections 1-15
overview 1-13
power cable 3-13
E
eddy current brake 4-2
bearing 4-11
controller cable 3-13
driver 4-17
front and rear covers 4-8, 4-16
installing 4-13
keyed yoke 4-12, 4-13
large top cover 4-7, 4-18
logo panel side cover 4-7, 4-18
mounting holes 4-3
optimal cooling 4-2
power cable 3-13
small top cover 4-7, 4-18
spline hub 4-12
splined shaft 4-12
u-joint 4-12
unpacking 4-4
zero calibration 4-19
eddy current brake driver 4-17
electrical requirements 1-9
electrostatic discharge vi
environmental requirements 1-9
ESD precautions vi
F
fire suppression 1-10
forklift requirements 1-10
G
grade 10.9 torque values F-4
grade 5 torque values F-2
grade 8 torque values F-3
grade 8.8 torque values F-4
H
hazards vii
height 1-4
hydraulic fluid 3-31
hydraulic motor requirements 1-10
hydraulic movement
dyno cylinder mount 3-23, 3-24
filling with fluid 3-31
hydraulic ram 3-24
installing 3-23
rotating the motor 3-27
spacers 3-25
stationary cylinder mount 3-25
wiring diagram 3-30
wiring the motor 3-29
hydraulic pump power cable 3-13
routing 3-15, 3-17, 3-21
I
interface bracket 2-11
interface guide 2-10
interface roller assembly E-2
interface tube E-3
IR temp sensor cable 3-14
K
keyed yoke 4-12, 4-13
L
length 1-4
lift
cross member 2-12, E-3
dyno placement 2-9, 2-11, E-3
interface guide 2-10
interface roller assembly E-2
lift kit C-16
lift requirements 1-16
load cell
installing 4-15
routing cable, 4WD 3-18, 3-21
zero calibration 4-19
load cell cable 3-14
load cell calibration 4-19
calibration arm 4-20
calibration number 4-20
calibration weights 4-22
loading the vehicle 6-2