Installing the Autoloader: Dell™ PowerVault™ 124T LTO6 SAS Autoloader User's Guide

Installation Overview

Product Overview

Installation Preparation

Unpacking the Autoloader

Host Bus Requirements

Identifying Product Components

Accessories

Connecting the SAS, Ethernet, and Power Cables

Choosing a Location

Preparing the Host and Verifying the Connection

UL Requirements

Installing the Device Drivers

Bar Code Reader

Enabling LUN Support in Linux

Installation Overview

Installing the autoloader consists of the following steps, which are explained in more detail later in this section:

1. Prepare to install your new Dell PowerVault 124T LTO6 SAS (Serial Attached SCSI) autoloader (see "

Installation Preparation

").

2. Identify the proper host bus type (see "

Host Bus Requirements

").

3. Identify the accessories that come with the autoloader (see "

Accessories

").

4. Install the autoloader in a computer rack near the host server. If installing a rack mount unit, refer to your rack Installation Guide.

5. Shut down or turn off the server and all devices attached to the server (see "

Connecting the SAS, Ethernet, and Power Cables

").

6. Attach the SAS cable to the autoloader and server's SAS host adapter (see "

Connecting the SAS, Ethernet, and Power Cables

").

7. Attach the Ethernet cable to the autoloader and server's Ethernet port or network (see "

Connecting the SAS, Ethernet, and Power Cables

").

8. Attach the power cable to the autoloader and plug in the power cable to the nearest power outlet (see "

Connecting the SAS, Ethernet, and Power Cables

"). Power

the autoloader on to ensure it passes the Power-on Self-Test (POST).

9. Set up the host and verify the connection (see "

Preparing the Host and Verifying the Connection

").

Installation Preparation

Before you install your new Dell PowerVault 124T LTO6 SAS autoloader, unpack it carefully and inspect it for any damage that might have occurred during shipping. The

Getting Started Guide included in the packaging describes all the necessary information to unpack and inspect your autoloader correctly. Locate the Getting Started Guide and

follow the directions.

Ensure that the work area is free from conditions that could cause electrostatic discharge (ESD). Discharge static electricity from your body by touching a known grounded

surface, such as your computer's metal chassis.

Host Bus Requirements

You must connect the Dell PowerVault 124T LTO6 SAS autoloader to a SAS host bus adapter (HBA).

Accessories

The following accessories are shipped with the Dell PowerVault 124T LTO6 SAS autoloader:

Getting Started Guide

SAS host cable

Hardware to rack mount the autoloader (autoloader rails are included, rack rails are optional)

One magazine blank (supplied only with a single magazine configuration)

Power cable

Bar code labels

TORX L-key drivers (T8 and T10)

Emergency Magazine Removal Tool

Choosing a Location

Choose a location that meets the following criteria (see "

Technical Specifications

"):

Caution: Do not place the autoloader on its side or upside down. Do not stack anything on top of the autoloader.

Rack

Requirements

Standard 19-inch rack with 2U (3.5 in.) of clearance.

Room

Temperature

10-35ºC (50-95ºF)

Power

Source

AC power voltage: 100-127 VAC; 200-240 VAC

Line frequency: 50-60 Hz

NOTE: Locate the AC outlet near the autoloader. The AC power cable should be easily accessible at all times.

Weight

14.1 kg (31 lb) unloaded