beautypg.com

Tramlining function – Great Plains V-300F Operator Manual User Manual

Page 58

background image

54

V300 & V300F

Great Plains Manufacturing, Inc.

148-057M-A

11/15/2007

Tramlining Function

If not used, tramlining

1

may be disabled. See page 56.

If disabled, the default display changes from Tramline
Bout

2

to Forward Speed.

Tramlining is enabled by default. The factory defaults for
tramlining bouts (on both drill and monitor console) are
based on:

• 3 meter planting width with 19 openers equally spaced

at 15.8 cm (6.2in). Rows are numbered 1-19 from left
to right

• Primary Tramline clutch on row 4

• Secondary Tramline clutch on row 16

• 1.8 meter wheel spacing of the tramlines

With these assumptions, the fluted feed cups allow for
the primary tramline clutch to be placed on rows 1, 4 or
6, and the secondary on rows 13, 14 and 16. An addi-
tional clutch and jumper Y-cable is available, and is
required on some patterns (i.e. 20 meter sprayer/20
bouts).

The tramline clutch and marker activations are as fol-
lows:

If pre-emergence (tramline) markers are installed, their
lift cylinders are controlled by solenoid valves connected
to the tramline clutch circuits. The markers are normally
in the lifted state, and lower automatically during tramline
bouts.

The monitor system automatically counts bouts when the
drill is lifted at the end of a pass (bout). If it is necessary
to override the count, use the

button.

There are five systems of tramlining - symmetric, asym-
metric left, asymmetric right and 20 bout. The tramline
bout is programmable from 1 to 15 in symmetric, asym-
metric left and asymmetric right sequences.

1. Tramlining is the selective disabling of seeding in rows

that are to be in the tire tracks of a sprayer that will be
employed post-planting or post-emergence. Different
rows (or no rows) may be disabled on each pass.

2. A “bout” is called a “pass” in North America.

12 meter sprayer / 4 bouts

18 meter sprayer / 6 bouts

Asymmetric right or left hand

Asymmetric right or left hand

Tramlines on rows 6 and 14

Tramlines on rows 6 and 14

Symmetric

Symmetric

Tramlines on rows 4 and 16 (bout #2 must overlap
bout #1 by half a drill width)

Tramlines on rows 4 and 16 (bout #2 must overlap
bout #1 by half a drill width)

15 meter sprayer / 5 bouts

20 meter sprayer/20 bouts

Symmetric

Special Pattern

Tramlines on rows 4 and 16

Tramlines on rows 1, 13, and 14 (this requires an
optional clutch and jumper cable, which intercon-
nects rows 1 and 13)

27205