Install Controls on Forward Tool Bar
These instructions apply to kits 411-035A and 411-036A.
For other kits, find the topic starting page in the table on
page 48.
Refer to Figure 60 (in which the orientation rose presumes
that the mainframe is in the unfolded position; if folded, the
front of the mainframe is actually to implement right)
95. Select one each new:
411-031K YP825R FLOW CONTROL ASSY
806-150C U-BOLT 3/8-16 X 7 1/32 X 6 GR5
and two sets new:
804-013C WASHER LOCK SPRING 3/8 PLT
803-014C NUT HEX 3/8-16 PLT
If the fasteners are pre-installed in the valve
assembly, completely remove them.
96. Place the U-bolt
, from the rear at approximately
the center of the forward tool bar on the mainframe.
97. The valve assembly
has port letters stamped
on the valve body. Orient the assembly so that ports
T & P are toward the front, and M & T toward the
back. Secure the valve assembly to the U-bolts with
the lock washers
and nuts
.
U
D
F
B
L
R
177
146
172
168
Figure 60:
Flow Controls on Forward Tool Bar
36306
146
177
172
168
177
146
172
168