Transmig 250i installation/setup, 19 changing the feed roll – Tweco 250i Transmig Inverter User Manual
Page 44
TRANSMIG 250i
INSTALLATION/SETUP
INSTALLATION/SETUP 3-26
Manual 0-5187
3.19 Changing the Feed Roll
NOTE
Feedrolls often come with a rust prohibitive coating that needs to be cleaned off before installation.
A Feedroll consists of two different sized grooves. As delivered from the factory the drive roll is installed for 0.9mm
/ 1.2mm.
The stamped marking on the feedroll refers to the groove furthest from the stamped marking. When mounted, that
will be the groove closest to the motor and the one to thread.
To ensure proper wire feed, the groove closest to the motor must match the electrode wire size being used.
1.2mm (.045”) Groove
Art: A-10345
The size that is visible when
fitting the feedroll is the groove
size in use.
.045
1.2
1.2mm (.045”) Stamping
.045
1.2
Figure 3-23: Feedroll Example
NOTE
All grooved feed rolls have their wire size or range stamped on the side of the roll. On rolls with different
size grooves, the outer (visible when installed) stamped wire size indicates the groove in use.
Refer to feed roll kit in the Appendix for the proper selection and ordering of feed roll kits. Kit includes drive rolls, an
input wire guide and an output wire guide for a specific wire type and size.
Feed rolls are removed by twisting the feed roll retainer cap and aligning the retaining knob splines/tabs with the drive
gear splines. Feedrolls are installed by putting the feedroll onto the drive gear splines and twisting the feedroll retainer
cap so that the splines/tabs rest against the face of the feedroll where they will click into place.
NOTE
Installation of all styles of feed rolls for the Transmig 250i are identical.
WARNING
The welding wire is electrically Hot if it is fed by depressing MIG Torch switch. Electrode contact to work
piece will cause an arc with MIG Torch switch depressed.