Hecklist, Installation checklist, Getting assistance from reliance electric – Rockwell Automation VSM500 Integrated Drive/Motor User Manual
Page 9

Installation Checklist
Checklist-1
C
HECKLIST
Installation Checklist
This manual describes how to install, troubleshoot, and maintain the VSM500 unit.
Use the following checklist to guide you through the installation process.
If problems occur during unit operation, refer to chapter 11 for troubleshooting
guidelines.
Getting Assistance from Reliance Electric
If you have any questions or problems with the products described in this instruction
manual, contact your local Reliance Electric sales office. For technical assistance,
note the unit’s model number and call 1-800-726-8112.
Installation Procedure
Read Manual
Section(s)
❑
Step 1
Identify your unit
1.0
Understand how the standard unit
operates
1.1
Understand how the local operator control
unit operates
1.2
❑
Step 2
Plan the installation
If your installation must be in compliance
with the European Community
Electromagnetic Compatibility Standards,
refer to Appendix F before proceeding.
2.0
❑
Step 3
Mount the unit
3.0
❑
Step 4
Install external components
AC input disconnect
Branch circuit protection
Input isolation transformers
4.0
4.1
4.2
4.3
❑
Step 5 Wire AC power to the unit and ground the unit
5.0
❑
Step 6
Install an emergency stop
6.0
❑
Step 7
Wire the control signal terminal strip
7.0
❑
Step 8
Verify the setup and adjust it if required
8.0
❑
Step 9
Check the installation
Perform power-off checks
Verify the direction of motor rotation
Attach the cover
Check the speed reference
9.0
9.1
9.2
9.3
9.4
❑
Step 10 Set the operating speed
10.0