Commissioning the drive – Rockwell Automation 7000A PowerFlex Medium Voltage AC Drive - Air-Cooled (A Frame) User Manual
Page 156

4-2 Commissioning
7000A-RM001A-EN-P – January 2011
7000 “A” Frame
13.
Apply medium voltage to the drive and perform operational
checks.
14.
Bump motor and tune drive to the system attributes. (If the
load is unable to handle any movement in the reverse direction
the load should be uncoupled prior to bumping the motor for
directional testing).
15.
Run the drive motor system throughout the operational range
to verify proper performance.
Please
Note: Customer personnel will be required on-site to
participate in the start-up of the system.
Commissioning the Drive
Information contained in this chapter will assist in
commissioning a PowerFlex air-cooled medium voltage AC
drive. This chapter contains reference material with information
including:
•
Recommended Tools and Equipment
•
Safety
Checks
•
Drive line-up Data Sheets
•
Pre-Power
Checks
•
Control Power Checks
Review the information contained in this chapter prior to
commissioning the drive. It will be used as a reference while the
drive line-up commissioning is performed. Record all the
information requested in the data sheets. The information
recorded on the data sheets will be useful during future
maintenance and troubleshooting exercises.
Perform the commissioning checks illustrated in this chapter in the
sequence that they have been presented. Failure to do so may result
in equipment failure or personal injury.
Start-up Commissioning
Services (cont.)