beautypg.com

Architectural, Endwall with reglet detail – Metal Sales Soffit Panel User Manual

Page 49

background image

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 02/09.

48

ARCHITECTURAL

ENDWALL WITH REGLET DETAIL

INSTALLATION NOTES

Z-Closure

Double Bead Tape Sealant

Fasteners (by others)

Roof Panel

Moisture Barrier (by others)

Pitch Break

Pop-Rivet (3 per panel) (see note below)

Clip

Reglet Flashing

Pancake Head Woodscrew (4 per panel)

Tube Sealant

1. Once panels have been installed, field cut the Z-Closure (See page 61) to fit between the panel ribs.
2. Place a row of Double Bead Tape Sealant across panel and over each panel rib approximately 2" from panel end. Before
proceeding make sure Z-Closure placement will accomodate Pitch Break flashing.
3. Install field cut Z-Closure as shown on page 61.
4. Fasten Z-Closure through panel with #10-12 x 1" Pancake Head Woodscrews (4 per panel).
5. Apply a continuous bead of Tube Sealant across top leg of Z-Closure filling any gaps or openings around panel ribs.
Position and install Pitch Break flashing to Z-Closure with

1

/

8

" x

3

/

16

" Pop Rivets (as shown).

6. Fasten vertical leg of Pitch Break to the parapet wall with the appropriate fastener (1'-0" o.c.).
7. Install Reglet in field cut groove in the parapet wall. Seal Reglet to parapet wall with Tube Sealant.
8. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a
bead of Tube Sealant between the flashings and securing with Pop Rivets 2.5" o.c.

Tube Sealant

3:12 Slope

Minimum

NOTE

For Mini/Maxi Batten Panels, Pop Rivet must

attach Pitch Break to each Batten Cap