ARCHITECTURAL
MAXI-BATTEN INSTALLATION
STEP
1
1RWH 0RLVWXUH %DUULHUV (DYH *XWWHU 9DOOH\ DQG 2IIVHW &OHDW ÀDVKLQJV PXVW ¿UVW EH LQVWDOOHG
before panel installation can begin (see pages 37-40).
Maxi-Batten panels are installed from left to right or right to left.
1. Field notch and hem the Maxi-Batten panel as shown on page 60. Apply a single bead of tube sealant
inside the open hem of the Maxi-Batten panel.
,QVWDOO ¿UVW SDQHO VR WKDW HDYH KDV SURSHU RYHUKDQJ PDNLQJ VXUH WKDW SDQHO LV VTXDUH WR HDYH DQG UDNH
Slide the panel toward the peak of the roof engaging the panel and the Offset Cleat. Offset Cleat
must be fully engaged into the panel. Additional overhang must be considered if using wall panels.
,W LV FULWLFDO WKDW WKH ¿UVW SDQHO EH VWUDLJKW DQG VTXDUH ZLWK WKH EXLOGLQJ DV LW FRQWUROV DOLJQPHQW
of the following roof panels.
STEP
2
INSTALLING FIRST PANEL
INSTALLING SECOND PANEL
Square panel to rake condition
Properly position panel
for eave condition
Properly position panel
for eave condition
1. Install second panel in place making sure panel is positioned with adequate space to allow
for placement of Maxi-Batten Clip. Make sure panel ends at eave are aligned.
Offset Cleat
Double Bead Tape Sealant
Offset Cleat
Double Bead Tape Sealant