Architectural, Valley with offset cleat detail – Metal Sales Soffit Panel User Manual
Page 41

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 02/09.
40
ARCHITECTURAL
VALLEY WITH OFFSET CLEAT DETAIL
3"
(Direct Fasten)
(Optional for Image II)
INSTALLATION NOTES
Panel rib must be field
notched and flat part
of panel must be field
bent to accept offset
cleat (see pages 59 and
60).
All Valley flashings must be installed prior to panel installation. If two or more valley flashings are required, valley
must be installed working from eave to peak. It is recommended that ice and water shield be installed under valley
flashing for added moisture protection.
1. Install Valley flashing against substrate. To hold Valley flashing in place, fasten to substrate with #10-12x1" Pancake Head
fastener
4'-0"o.c.
2. Apply a row of Double Bead Tape Sealant across both sides of Valley flashing approximately 5" from center of valley.
3. Properly align and install Offset Cleat on both sides of Valley flashing to accommodate panel hem and fasten to substrate
with
#10-12x1" Pancake Head fastener 12" o.c..
4. Install panel by engaging field hemmed end of panel (see pages 59 and 60) to Offset Cleat (see pages 24-34 for panel
installation).
5. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2", placing 2
beads of Tube Sealant between the flashings.
Tube Sealant
Double Bead Tape Sealant
Offset Cleat
Mini/Maxi-Batten Panel
Moisture Barrier (by others)
Valley
Pancake Head Woodscrew (1'-0" o.c.)
Clip
3" Min.
3:12 Slope
Minimum