beautypg.com

Step 3, Step 4, Architectural – Metal Sales Soffit Panel User Manual

Page 32

background image

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 02/09.

31

ARCHITECTURAL

STEP

3

Maxi-Batten Clip

MAXI-BATTEN INSTALLATION (

CONT

.)

STEP

4

INSTALLING CLIPS

1. Engage clips at proper spacing along the male legs and fasten with appropriate fastener to meet local

building codes (see page 23). If a fastener strips out, you must remove the clip and reposition it so

the fastener can drill a new hole at least

3

/

8

" from the stripped hole or install an oversized fastener in

the stripped hole. Failure to do so will result in weakening the wind uplift resistance.

2. Continue with previous steps until panel installation is complete.

1. Install Maxi-Batten Cap over the panel rib and Maxi-Batten Clip. Snap Maxi-Batten Cap into place

working from one end to the other. Make sure all batten caps are properly snapped in place. Clean

any debris and excess sealant from the panels.

2QFH LQVWDOODWLRQ LV FRPSOHWH FORVH RSHQ HQG RI SDQHO ZLWK HLWKHU ¿HOG IDEULFDWHG SLHFH RU RUGHU %DWWHQ

Cap 1" longer (see detail on page 32).

3. $WWDFK HYHU\ %DWWHQ &DS WR WKH ÀDVKLQJ QHDU WKH KLJK HQG RI WKH %DWWHQ &DS ZLWK D 3RS 5LYHW

as shown below.

INSTALLING BATTEN CAP

Maxi-Batten Assembly

Maxi-Batten Cap

Square panel to
rake condition

Properly position panel
for eave condition

Maxi-Batten Clip

Maxi-Batten Clip

Pop Rivet (fasten Cap to
flashing)

Flashing