Step 3, Step 4, Architectural – Metal Sales Soffit Panel User Manual
Page 32

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 02/09.
31
ARCHITECTURAL
STEP
3
Maxi-Batten Clip
MAXI-BATTEN INSTALLATION (
CONT
.)
STEP
4
INSTALLING CLIPS
1. Engage clips at proper spacing along the male legs and fasten with appropriate fastener to meet local
building codes (see page 23). If a fastener strips out, you must remove the clip and reposition it so
the fastener can drill a new hole at least
3
/
8
" from the stripped hole or install an oversized fastener in
the stripped hole. Failure to do so will result in weakening the wind uplift resistance.
2. Continue with previous steps until panel installation is complete.
1. Install Maxi-Batten Cap over the panel rib and Maxi-Batten Clip. Snap Maxi-Batten Cap into place
working from one end to the other. Make sure all batten caps are properly snapped in place. Clean
any debris and excess sealant from the panels.
2QFH LQVWDOODWLRQ LV FRPSOHWH FORVH RSHQ HQG RI SDQHO ZLWK HLWKHU ¿HOG IDEULFDWHG SLHFH RU RUGHU %DWWHQ
Cap 1" longer (see detail on page 32).
3. $WWDFK HYHU\ %DWWHQ &DS WR WKH ÀDVKLQJ QHDU WKH KLJK HQG RI WKH %DWWHQ &DS ZLWK D 3RS 5LYHW
as shown below.
INSTALLING BATTEN CAP
Maxi-Batten Assembly
Maxi-Batten Cap
Square panel to
rake condition
Properly position panel
for eave condition
Maxi-Batten Clip
Maxi-Batten Clip
Pop Rivet (fasten Cap to
flashing)
Flashing