INSTALLATION NOTES
Z-Closure
Double Bead Tape Sealant
Cleat
Roof Panel
Moisture Barrier (by others)
Rake
Pancake Head Woodscrew (1'-0" o.c.)
Pop-Rivet (1'-0" o.c.)
Double Bead Tape Sealant
Pancake Head Woodscrew (1'-0" o.c.)
1. If panel ends off module bend flat part of the panel up a minimum of 1", otherwise skip to the next note.
2. Apply a row of Double Bead Tape Sealant to the flat part of the panel next to the panel rib or vertical field bent leg.
3. Position Z-Closure over tape sealant and fasten to wood substrate with #10-12 x 1" Pancake Head Woodscrew, 12" o.c.
Fastener must penetrate through the Z-Closure, Tape Sealant, and panel.
4. Position and install Cleat to wall with appropriate fastener, 12” o.c. Make sure Cleat installation allows for proper Rake
attachment.
5. Apply a row of Double Bead Tape Sealant to top leg of the Z-Closure.
6. Install Rake by sliding the open hem onto the Cleat and then attaching to the Z-Closure with
1
/
8
"x
3
/
16
" Pop Rivets at 12" o.c.
7. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a
bead of Tube Sealant between the flashings and securing with pop rivets 2.5" o.c.
(Not available for Pro-Loc.)
3:12 Slope