beautypg.com

Step 3, Architectural – Metal Sales Soffit Panel User Manual

Page 28

background image

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 02/09.

27

ARCHITECTURAL

PRO-LOC (CDF) INSTALLATION (

CONT

.)

STEP

3

INSTALLING SECOND PANEL

1. Field notch second panel rib for Starter installation.
2. Apply a continuous bead of tube sealant inside panel rib and insert Inside Closure at base of panel.
3. Rotate second panel in place (positions 1, 2, and 3 see below), and slide pan into Starter. Make sure

panel ends are aligned.

4. Attach panel to substrate with proper fastener and proper spacing as required by local building codes.
5. Repeat Steps 1, 2, and 3 for remaining panels.

Position 1

Insert anchor leg

into formed receiving

groove of previously

fastened panel.

Position 2

Rotate panel over

fasteners of previous

panel.

Position 3

Inspect rib to insure

entire anchor leg

is firmly seated in

receiving groove and

fasten firmly to roofing

structure.

Properly position panel
keeping ends flush

Square panel to wall end

Double Bead Tape Sealant

Starter Flashing

Base Flashing

Insert Inside
Closure before
installing second
panel