beautypg.com

Architectural, Vented ridge detail – Metal Sales Soffit Panel User Manual

Page 46

background image

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 02/09.

45

ARCHITECTURAL

VENTED RIDGE DETAIL

INSTALLATION NOTES

Pop-Rivet (see note below)

Double Bead Tape Sealant
Offset Cleat

Roof Panel

Moisture Barrier (by others)

Vented Ridge Cover

Dekfast (1'-0" o.c.)

Pop-Rivet (1'-0" o.c.)

Pancake Head Woodscrew (4 per panel)

Clip

Vent Material

Double Bead Tape Sealant

Pancake Head Woodscrew

1. Once panels have been installed, field cut the Z-Closure (See page 61) to fit between the panel ribs.
2. Place a row of Double Bead Tape Sealant across panel and over each panel rib approximately 2" from panel end. Before
proceeding, make sure Z-Closure placement will accomodate Vented Ridge cover.
3. Install field cut Z-Closure as shown on page 61.
4. Fasten Z-Closure through panel with #10-12 x 1" Pancake Head Woodscrews (4 per panel).
5. Apply a row of Double Bead Tape Sealant across top leg of Z-Closure filling any gaps or openings around panel ribs.
6. Install Vent Drip, Vent Material, and Offset Cleat, as shown above with #14-13 x 1

5

/

8

" Dekfast screws, 12" o.c. and apply

a row of Double Bead Tape Sealant to the top leg of the Offset Cleat.
7. Install Vented Ridge Cover to Offset Cleat with

1

/

8

" Pop Rivets at 12" o.c.

8. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a
bead of Tube Sealant between the flashings and securing with pop rivets 2.5" o.c.

(Optional 1)
(With Cobra Vented Closure)

(Optional 2)
(With Perforated Vent Drip)

Tube Sealant

3:12 Slope

Minimum

Vent Drip

NOTE

For Mini/Maxi Batten Panels, Pop Rivet

must attach each Batten Cap to Panel

CAUTION

Additional screws may be required for high

snow loading and steep slopes.