Step 3, Architectural – Metal Sales Soffit Panel User Manual
Page 26

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 02/09.
25
ARCHITECTURAL
PRO-LOC (CCS) INSTALLATION (
CONT
.)
STEP
3
INSTALLING SECOND PANEL
Square panel to rake condition
Properly position panel
keeping ends flush
Position 1
Insert anchor leg
between exposed rib
and formed receiving
groove.
Position 2
Rotate panel over clip
thereby concealing
fastening system.
Position 3
Inspect rib to insure
entire anchor leg
is firmly seated in
receiving groove.
1. Field notch and hem the second Pro-Loc (CCS) panel as shown on page 59. Apply a single bead of
tube sealant inside the open hem of the Pro-Loc panel.
2. Rotate second panel in place (see positions 1, 2, and 3 below) making sure that the panel ribs fully
engage. Slide the panel toward the peak of the roof engaging the panel and the Offset Cleat.
3. Engage clips over male leg of panel. Fasten the Pro-Loc clip to the deck with the proper type and
number of fasteners (see chart on page 23). If a fastener strips out, you must remove the clip and
reposition it so the fastener can drill a new hole at least
3
/
8
" from the stripped hole or install an
oversized fastener in the stripped hole. Failure to do so will result in weakening the wind uplift
resistance.
4. Repeat steps 1, 2, and 3 for remaining panels.
0DNH VXUH DOO SDQHOV DUH ¿UPO\ VHDWHG LQWR UHFHLYLQJ JURRYH
2QFH LQVWDOODWLRQ LV FRPSOHWH ¿OO HDFK HQG RI SDQHO VHDP ZLWK SURSHU LQVLGH FORVXUH VHH SDJH DQG
clean any debris and excess sealant from the panels.
Offset Cleat
Double Bead
Tape Sealant