Step 3, Architectural – Metal Sales Soffit Panel User Manual

Page 26

background image

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 02/09.

25

ARCHITECTURAL

PRO-LOC (CCS) INSTALLATION (

CONT

.)

STEP

3

INSTALLING SECOND PANEL

Square panel to rake condition

Properly position panel
keeping ends flush

Position 1

Insert anchor leg

between exposed rib

and formed receiving

groove.

Position 2

Rotate panel over clip

thereby concealing

fastening system.

Position 3

Inspect rib to insure

entire anchor leg

is firmly seated in

receiving groove.

1. Field notch and hem the second Pro-Loc (CCS) panel as shown on page 59. Apply a single bead of

tube sealant inside the open hem of the Pro-Loc panel.

2. Rotate second panel in place (see positions 1, 2, and 3 below) making sure that the panel ribs fully

engage. Slide the panel toward the peak of the roof engaging the panel and the Offset Cleat.

3. Engage clips over male leg of panel. Fasten the Pro-Loc clip to the deck with the proper type and

number of fasteners (see chart on page 23). If a fastener strips out, you must remove the clip and

reposition it so the fastener can drill a new hole at least

3

/

8

" from the stripped hole or install an

oversized fastener in the stripped hole. Failure to do so will result in weakening the wind uplift

resistance.
4. Repeat steps 1, 2, and 3 for remaining panels.

0DNH VXUH DOO SDQHOV DUH ¿UPO\ VHDWHG LQWR UHFHLYLQJ JURRYH

2QFH LQVWDOODWLRQ LV FRPSOHWH ¿OO HDFK HQG RI SDQHO VHDP ZLWK SURSHU LQVLGH FORVXUH VHH SDJH DQG

clean any debris and excess sealant from the panels.

Offset Cleat

Double Bead
Tape Sealant