INFICON 3000 Micro GC Gas Analyzer Operating Manual User Manual
Page 226

8 - 44
PN
07
4-
51
9-
P1
C
3000 Micro GC Operating Manual
Proceed as follows:
1
Connect the Carrier Gas Cylinder Recharge Kit (PN PNU-2058) to the supply 
tank via the CGA-580 fitting. See 
. To avoid leaks, tighten the
connections securely.
2
Make sure the needle valve of the Carrier Gas Cylinder Recharge Kit is fully 
closed by turning the needle valve clockwise until it is firmly seated. See 
Figure 8-44 Cylinder recharging kit setup
3
Partially open the valve on the supply tank. No gas should flow.
4
Loosely connect the 1/8 in. tube from the Carrier Gas Cylinder Recharge Kit to 
the CARRIER FILL (Swagelok) port on the Portable 3000 Micro GC back 
panel. See 
.
Figure 8-45 Back of Portable 3000 Micro GC
5
Partially open the needle valve on the Carrier Gas Cylinder Recharge Kit and 
listen for gas leaking through the loose 1/8 in. fitting on the back panel. This 
purges the Carrier Gas Cylinder Recharge Kit transfer lines so that no air enters 
Portable 3000 Micro GC.
6
After the transfer lines have been sufficiently purged (about fifteen seconds), 
tighten the 1/8 in. fitting on the back panel of Portable 3000 Micro GC.
To the 3000 Micro GC
1800 PSI (12,450 kPa)
Carrier fill port
Transfer line
with Swagelok
fittings
Supply tank
Overpressure vent
Supply tank
valve
Pressure gauge
CGA 580 fitting
Needle valve
Carrier fill
port
Carrier 
jumper tube
Carrier in ports
