beautypg.com

Festo Кабели и принадлежности User Manual

Page 42

background image

4.1.2 Commissioning the field bus (summary)

Proceed as follows when commissioning the SPC200
as a field bus slave:

1. Make sure that the field bus module is installed in

the SPC200 system and that the I/O range is con-
figured correctly for INTERBUS with the aid of Win-
PISA (see Chapter 4.1.3).

2. Install INTERBUS completely with all relevant slaves

and prepare all slaves for commissioning.

3. Configure INTERBUS with the appropriate configura-

tion software (e.g. with CMD software).

4. Switch on the power supply to the INTERBUS and

start the complete commissioning of all the slaves.

Further details can be found in the sections which fol-
low.

4. Commissioning

4-8

SPC200-COM-IBS 0503a