beautypg.com

Festo Кабели и принадлежности User Manual

Page 39

background image

WARNING
Make sure that nobody can place his/her hand in the
positioning range of the moving mass and that no
objects lie in this path.

In order to generate control signals in test mode, first
activate the command [Online] [Observe] [Selection]
[Control signals]. Then switch on the test mode, e.g.
with function key F5. The contents of the window [Con-
trol signals] depends on the operating mode set.

'

= 1-signal

©

ª

ENABLE
Stop signal

«

Display for test mode

Fig. 4/1: Control signals for commissioning (example)

Especially the signals ENABLE and STOP are import-
ant for commmissioning.

Now refer to the WinPISA manual for information on
carrying out commissioning.

«

©

ª

4. Commissioning

SPC200-COM-IBS 0503a

4-5