Festo Кабели и принадлежности User Manual
Page 38
4.1.1 Additional instructions on commissioning with WinPISA
Proceed first of all as described in the WinPISA manual
(see Chapter 4 in the WinPISA manual).
With some of the commissioning steps, the signals
ENABLE, START and STOP are required for controlling
the axes, e.g. with the steps:
– movement test
– identification travel
– test and start program
If a field bus module is installed, you can generate
these control signals in the test mode when com-
missioning. Commissioning can then be carried out in-
dependently of the INTERBUS master.
Activating the test mode
CAUTION
You can specify input signals in test mode. The input
signals actually present will be ignored.
Activate the test mode only:
– when the SPC200 is not connected to the field
bus or when it is not online or
– when you are aware of the effects produced by
the signals.
4. Commissioning
4-4
SPC200-COM-IBS 0503a