beautypg.com

To reinstall or update the management agent using, Remove the master from the chassis if this is a, When removing any department concentrator module – Allied Telesis AT-S10 TurboStack User Manual

Page 65: Unplug the hub’s power cord, Be sure to unplug the hub’s power cord before inst, Locate the blank cover plate on the firmware ca, Turn the thumbscrews counterclockwise until the, Slide the firmware cassette into the port, firm, Plug the power cord into the hub, Unplug the hub and remove the software cassette

background image

AT-S10 Management Software User’s Guide

55

To reinstall or update the management agent using the cassette:

1.

Remove the master from the chassis if this is a department
concentrator configuration; otherwise, skip to Step 2.

NOTE

When removing any department concentrator module, always disengage
the module from the chassis backplane before unplugging the power cord;
i.e., use the hot swapping method. Refer to your chassis manual for more
information.

The module is now a standalone hub.

2.

Unplug the hub’s power cord.

ATTENTION

Be sure to unplug the hub’s power cord before installing and removing the
firmware cassette.

3.

Locate the blank cover plate on the firmware cassette slot on the hub’s
back panel (see Figure 4).

4.

Turn the thumbscrews counterclockwise until they loosen, then grasp
them to slide out the cover plate.

5.

Slide the firmware cassette into the port, firmly pressing the connector
into place; then turn the thumbscrews clockwise to secure the cassette
to the hub’s back panel.

Make sure the firmware cassette is flush with the hub panel.

6.

Plug the power cord into the hub.

Downloading proceeds, taking up to two minutes. The hub’s front
panel LEDs flash continuously during downloading. The

FAULT

LED flashes once at the end of the download process.

7.

Unplug the hub and remove the software cassette.

Figure 4: Cassette Slot

Location on Hub’s
Back Panel

Cassette slot
cover plate