beautypg.com

8 switching on, 1 before powering the device, 2 checks list – Videotec NXPTZT User Manual

Page 25: 1 before powering the device 8.2 checks list

background image

Instruc

tions manual - English - EN

25

MNVCNXPTZT_1343_EN

8 Switching on

The automatic pre-heating (De-Ice) process

could be started whenever the device is

switched on and the air temperature is

below 0°C. This process is used to ensure

that the device works properly even at

low temperatures. The duration ranges

between 60 and 120 minutes, depending

on conditions.

The unit is switched on by simply connecting the

power supply. To switch off the unit disconnect the

power.

8.1 Before powering the device

Make sure that the unit and other

components of the installation are closed

so that it is impossible to come into contact

with live parts.

Make sure that all parts are fastened down

firmly and safely.

The first time the device is switched on we

recommend making sure it is configured correctly.
To do this, disconnect the power supply, remove the

dip-switch protection window and set the Display

Configuration dip-switch rocker (DIP1, SW1) to ON.
Power the device and after a few seconds it will be

possible to check the settings on the screen.
After completing the check, switch off the device and

re-toggle the Display Configuration dip-switch rocker

(DIP1, SW1).
Close the door and re-connect the power supply.

8.2 Checks list

If one of the checks fails (ERR), seek

assistance. The message “- -“ means that the

pan & tilt is not fitted with the described

option.

The content of this chapter does not apply

to the versions with digital video encoder.

While it is switching on, the device displays a list of

the checks it has to carry out before starting normal

operation.

STARTUP

Reading Parameters...OK

Zero axis............OK

Camera...........36x.OK

Temperature probe....OK

IR Spotlight.........--

Wiper................--

Optional Board.......--

Fig. 27

This manual is related to the following products: