8 switching on, 1 before powering the device, 2 checks list – Videotec NXPTZT User Manual
Page 25: 1 before powering the device 8.2 checks list
Instruc
tions manual - English - EN
25
MNVCNXPTZT_1343_EN
8 Switching on
The automatic pre-heating (De-Ice) process
could be started whenever the device is
switched on and the air temperature is
below 0°C. This process is used to ensure
that the device works properly even at
low temperatures. The duration ranges
between 60 and 120 minutes, depending
on conditions.
The unit is switched on by simply connecting the
power supply. To switch off the unit disconnect the
power.
8.1 Before powering the device
Make sure that the unit and other
components of the installation are closed
so that it is impossible to come into contact
with live parts.
Make sure that all parts are fastened down
firmly and safely.
The first time the device is switched on we
recommend making sure it is configured correctly.
To do this, disconnect the power supply, remove the
dip-switch protection window and set the Display
Configuration dip-switch rocker (DIP1, SW1) to ON.
Power the device and after a few seconds it will be
possible to check the settings on the screen.
After completing the check, switch off the device and
re-toggle the Display Configuration dip-switch rocker
(DIP1, SW1).
Close the door and re-connect the power supply.
8.2 Checks list
If one of the checks fails (ERR), seek
assistance. The message “- -“ means that the
pan & tilt is not fitted with the described
option.
The content of this chapter does not apply
to the versions with digital video encoder.
While it is switching on, the device displays a list of
the checks it has to carry out before starting normal
operation.
STARTUP
Reading Parameters...OK
Zero axis............OK
Camera...........36x.OK
Temperature probe....OK
IR Spotlight.........--
Wiper................--
Optional Board.......--
Fig. 27