Confirming copy status during task execution – HP XP P9000 Command View Advanced Edition Software User Manual
Page 225
6.
Set the operation (Pair Operation) and options to change the pair status, and then click the Next
button.
The 4. Confirm page appears.
CAUTION:
Please confirm the following before confirming the pair status change operation:
• Before a split operation is performed, ensure that I/O processing for the primary volume
is not being performed because this operation might result in incomplete data in the
secondary volume.
• Before a Resync operation, ensure that the data in the secondary volume is no longer
required since this operation will overwrite the secondary volume data.
• Before a Restore operation is performed, ensure that the data in the primary volume is
no longer required because this operation will overwrite the primary volume data.
• Ensure the value of the copy pace is correct because this operation may take longer if
an incorrect value is used.
7.
Check the specified settings, and then click the Confirm button.
The 5. Finish page appears.
8.
Click the Finish button.
The settings specified in the wizard are registered as tasks. Check the Status column for the tasks
to make sure that the pair status was changed successfully. To view the tasks, from the Explorer
menu, select Tasks and then Tasks.
TIP:
In 3DC Delta Resync configurations, executing pair operations against Cnt Ac-S or Cnt Ac-J (DeltaUR)
changes the related copy group status. Refresh configuration after the Task execution. If the related
copy group status is not changed, execute the Refresh Copy Group operation.
Related topics
• Limitations when performing 3DC configuration pair operations (mainframe systems)
• When performing operations on EXCTGs (mainframe systems)
Confirming copy status during task execution
To confirm copy status during task execution:
1.
In the Explorer menu, choose Tasks and then Tasks.
A list of tasks is displayed in the Tasks subwindow.
2.
Select a task and click the copy group name hot link.
The copy-group-name subwindow is displayed
3.
Confirm the copy progress and whether the pair is in Copying status.
4.
After several minutes, click the Refresh Copy Group button.
User Guide
225