Installation, 7 mounting – KROHNE OPTIBAR PC 5060 C EN User Manual
Page 19
INSTALLATION
3
19
OPTIBAR PC 5060 C
www.krohne.com
04/2014 - 4003437201 - MA OPTIBAR PC 5060 C R01 en
3.7 Mounting
3.7.1 Rotating the housing
The transmitter housing can be rotated 350° for better readability of the display or access to the
wiring. A stop prevents the housing from being rotated too far.
• On all 2 chamber housings, the locking screw must first be loosened at the neck of the
housing.
i
The housing can then be rotated to the desired position.
• Once the desired position is reached, the locking screw is tightened again.
3.7.2 Mounting the display and adjustment module
The optional display and adjustment module can be set in any one of four different positions at
90° intervals. The installation of the adjustment module is carried out as per the illustrations
below. To do so, unscrew the housing cover and insert the adjustment module clockwise. The
display can be installed rotated at 90°. It is not necessary to interrupt the power supply.
CAUTION!
•
Prior to installing the pressure transmitter, it is essential to verify whether the version of the
device on hand completely fulfils the technical and safety requirements of the measuring
point. This applies in particular to the measuring range, overpressure resistance,
temperature, explosion protection and operating voltage.
•
Check the materials used for the wetted parts (e.g. gasket, process connection, separating
diaphragm etc.) for suitability as regards process compatibility.
Figure 3-1: Installation in single chamber housing
1 Insert the display and adjustment module into the housing
2 Turn the display and adjustment module clockwise
.book Page 19 Friday, May 2, 2014 12:49 PM