Chapter 5 Configuring the PowerSmart Socket PQM

General Meter Setup

PowerSmart Socket Power Quality Meter

81

Billing Point

Metering Point

Supply side,
far end

Supply side,
transformer end

Load side,
transformer end

Load side,
far end

Supply side,
far end

-Supply line losses

-Supply line losses
-Transformer losses

-Supply line losses
-Transformer losses
-Load line losses

Supply side,
transformer end

+Supply line losses

-Transformer losses -Transformer losses

-Load line losses

Load side,
transformer end

+Supply line losses
+Transformer losses

+Transformer losses

-Load line losses

Load side,
far end

+Supply line losses
+Transformer losses
+Load line losses

+Transformer losses
+Load line losses

+Load line losses

2. Select the number of metering elements depending on

the wiring mode set in the meter. It is not a critical
parameter and the actual losses will not be affected by
this setting.

3. Specify the power transformer data. It is normally

taken

from

the

transformer

nameplate

and

transformer datasheet. All transformer data is given
for a 3-phase system.

4. If the supply-side or/and load-side power line losses

are to be included in compensation, specify the length
of power lines and their resistance and reactance per
mile or km. To change the length units, select Options
from the Tools menu, click on the Preferences tab, and
then check the preferred distance units.

5. After all data is specified, click on the Calculate %Loss

Constants button to update the loss constants.

6. Select Enable in the Loss Compensation Enabled box to

enable loss compensation in the meter.

7. Send your new setup to the meter.