Extron Electronics TLP 1000TV User Guide User Manual
Page 34

5.
The project can be uploaded to one or more TouchLink panels. To add a panel:
a.
From the
Project
menu, select
Add > Panel
:
Figure 32.
Add a TouchLink Panel
The Panel Manager dialog box opens:
Figure 33.
Panel Manager Dialog Box
b.
Click the
Add Panel
icon (shown to the right) to add a new panel to
the left pane.
c.
Highlight the name of the panel in the left pane to display the
properties of that panel in the right pane.
d.
The default IP address (192.168.254.254) is assigned to any new panel that is
added. To change the IP address, highlight the address property in the right pane
and type in the correct IP address. Update any other properties, as required.
e.
Repeat steps
5b - 5d to add further panels, if required.
6.
To upload a project to a TouchLink panel:
a.
From the
Project
menu, select
Upload to Selected Panels
. The Build
Manager dialog box opens, showing the build progress. After the build is
complete, this dialog box closes and the File Upload Manager screen opens. The
upload begins automatically.
b.
Select
Close this dialog when upload completes
check box in the
Automatic Settings section so that the File Upload Manager screen closes
automatically when the upload completes. This option can be set before or during
the upload.
TLP 1000MV and TLP 1000TV • Configuration Software
28