8 logging, 1 typical sequence of a logging job (checklist), Logging – Xylem WQL-Cond CONDUCTIVITY DATALOGGERS User Manual
Page 44: Typical sequence of a logging job (checklist), 8logging
Logging
WQL-Cond
140
ba75822e01
03/2011
8
Logging
Listed below are the typical operating steps with which to set up and carry out
a logging job. The chapters where the operating steps are described in detail
are also mentioned.
8.1
Typical sequence of a logging job (checklist)
1
Connect the logger to the PC with the USB cable.
2
Start the WQL-Log program (see section 3.6 S
).
3
Register the logger (see section 3.6 S
).
4
If a logging job is running, terminate or interrupt it (see section
8.8 M
5
Erase the logger memory if necessary (see section 8.8 M
6
Calibrate the logger (see chapter 6 C
7
Set up the logging job and send it (see section 8.3 S
).
8
Disconnect the USB cable from the logger.
9
If necessary, start the logger with the key button.
10
Check the operation of the logger based on the behavior of the signal
LED (see section 8.5 S
11
Tightly close the logger with the cap.
12
Install the logger at the measuring location.
13
After completion of the logging job: Connect the logger to the PC with
the USB cable (see step 1 etc.).