Power Monitoring
E51C2, E51C3
TM
Problem
Cause
Solution
The maintenance wrench
icon appears in the power
meter display.
There is a problem
with the inputs to the
power meter.
See the Alert sub-menu or the Diagnostic Alert Modbus Register 146
The display is blank after
applying control power
to the meter.
The meter is not
receiving adequate
power.
Verify that the meter control power are receiving the required voltage.
Verify that the heart icon is blinking.
Check the fuse.
The data displayed is
inaccurate.
Incorrect setup values
Verify the values entered for power meter setup parameters (CT and PT ratings,
system type, etc.). See the Setup section.
Incorrect voltage inputs Check power meter voltage input terminals to verify adequate voltage.
Power meter is wired
improperly.
Check all CTs and PTs to verify correct connection to the same service, CT and PT
polarity, and adequate powering. See the Wiring Diagrams section for more
information.
Cannot communicate
with power meter from
a remote personal
computer.
Power meter address is
incorrect.
Verify that the meter is correctly addressed (see Setup section).
Power meter baud rate
is incorrect.
Verify that the baud rate of the meter matches that of all other devices on its
communications link (see Setup section).
Communications
lines are improperly
connected.
Verify the power meter communications connections (see the Communications
section).
Verify the terminating resistors are properly installed on both ends of a chain of units.
Units in the middle of a chain should not have a terminator.
Verify the shield ground is connected between all units.
Sign of one phase (real
power) is incorrect
CT orientation reversed
Remove CT, reverse orientation, reconnect (qualified personnel only)
Troubleshooting
China RoHS Compliance Information
(EFUP Table)
部件名称
产品中有毒有害物质或元素的名称及含量Substances
铅 (Pb) 汞 (Hg)
镉 (Cd)
六价铬 (Cr(VI))
多溴联苯(PBB)
多溴二苯醚(PBDE)
电子线路板
X
O
O
O
O
O
O = 表示该有毒有害物质在该部件所有均质材料中的含量均在 SJ/T11363-2006 标准规定的限量要求以下.
X = 表示该有毒有害物质至少在该部件的某一均质材料中的含量超出SJ/T11363-2006标准规定的限量要求.
Z000057-0A