4 repacking the case, Repacking the case – Olympus IPLEX MX II User Manual
Page 77
71
Chapter 7 Storage and maintenance
7.4
Repacking the case
Repack the equipment in the order of: Control unit
→
Insertion tube
→
Main unit.
Insertion tube
Control unit
Main unit
Storage process label
Control unit
Insertion tube
Universal cable
Insertion tube
Storage
groove
Shoulder strap
Wind the insertion tube into the storage groove.
Stow the main unit on top of the insertion
tube.
Next, wind and stow the universal cable.
Last, stow the shoulder strap.
Stow the control unit first.