beautypg.com

Siemens 2015 User Manual

Page 10

background image

Putting the equipment into operation - step by step

1

Gigaset 2015 plus, GBR: A30852-X-1105-B301-1-7619

kap02.fm5

29.10.99

Putting the equipment into operation - step by step

Follow the installation and setup instructions “step by
step” as described in the following:

1st step: reading the safety information

2nd step: checking the contents of the package

When delivered, the package contains the following:

one Gigaset 2015 plus base station (see also label
with CE sign on lower part of base station)

one Gigaset 2000S standard handset (see also mark-
ing on rear of handset),

one telephone connecting cable with Mini-Western
plug and telephone plug

one power connecting cable with Mini-Western plug
and power supply unit,

one cover for battery compartment of handset

one carrying clip for handset

two batteries

one set of operating instructions

Before starting, make sure you have studied
the safety information carefully!