SMA SB 2000HF-30 Installation User Manual

Page 39

background image

SMA Solar Technology AG

Electrical Connection

Installation Manual

SB20HF-30HF-IA-en-32

39

6. Thread the threaded sleeve (C) with the sealing ring over the AC cable.

7. Bend the AC cable for the connection if necessary.

The bending radius must be at least four times the
cable diameter.

8. Shorten the AC cable.

9. Strip approx. 30 mm from the AC cable.

10. Shorten phase L and neutral conductor N 4 to 5 mm.

The PE protective conductor must be longer than the insulated conductors of N and L.

11. Strip 8 mm of insulation from the AC cable.
12. Insert the protective conductor PE (green‑yellow)

into the screw terminal with the ground sign on the
jack element and tighten the screw.

13. Insert the neutral conductor N (blue) into the screw

terminal N on the jack element and tighten the
screw.

14. Insert phase L (brown or black) into screw terminal

L on the jack element and tighten the screw.

15. Make sure the insulated conductors are securely

connected.

16. Push the threaded sleeve (C) onto the jack element (B) until it audibly snaps into place.